Client | |
---|---|
Year | |
Value | |
Position |
Description:
- Breaking up and removal of reinforced concrete payment and kerb.
- Enlargement of bridge to provide planked walkways on steel structure on both sides including metal balustrading.
- The work to be carried out approximately 5M above water level.Resurfacing of existing roadworks
- Landscaping and Associated Works.