Islamic Cultural Centre (ICC) at Port Louis – Phase II

Client
Year
Value
Position

Description:

  • Construction of School Building, Ground to third floor, including one mezzanine.
  • Multi-purpose hall, Ground plus Upper Mezzanine level. (Total GFA 2800m²)
  • Finishing Works – Phase II
  • Islamic School Tower – 10 Classrooms (40m² each), Library (250m²),
  • Offices & Staff room (250 m²), Facilities, Audio Visual rooms, Computer rooms, Lecture theatres (capacity 50 persons), Mess room, Printing room (Total GFA 1300 m²).
  • Multi Purpose Hall (1200m²)
  • Plant Room: Structure in reinforced concrete blockwalling and claustra with concrete flat slab and galvanised metal windows and doors. (GFA 100m²)
  • Internal and External Services: Plumbing, Electrical, Ventilation, Fire Fighting and Allied Works.
  • External drainage and site works