| Client | |
|---|---|
| Year | |
| Value | |
| Position |
Description:
- Breaking up and removal of reinforced concrete payment and kerb.
- Enlargement of bridge to provide planked walkways on steel structure on both sides including metal balustrading.
- The work to be carried out approximately 5M above water level.Resurfacing of existing roadworks
- Landscaping and Associated Works.